SL Project Title Details
1 132 kV Grid Network Development Project in Eastern Region.
2 400/230/132 kV Grid Network Development Project
3 Aminbazar - Maowa - Mongla 400 KV Transmission Line Project
4 Aminbazar - Old Airport 230 kV Transmission Line and Associated Substations
5 Aminbazar-Savar 132 kV Transmission Line & Savar 132/33 kV Substation Project
6 Amnura 132/33 kV Grid Substation with associated 132 kV Transmission Line Project.
7 Ashuganj - Shahjibazar 132 KV Single Circuit Transmission Line Project
8 Ashuganj-Bhulta 400 kV Transmission Line
9 Bangladesh Power System Reliability and Efficiency Improvement Project
10 Barisal-Bhola-Burhanuddin 230 kV Transmission Line Project
11 Bibiyana - Comilla (North) 230 kV Transmission Line Project
12 Bibiyana-Kaliakoir 400 KV and Fenchuganj-Bibiyana 230kV Transmission Line Project
13 Capacity Upgradation (500 MW) of the existing Bangladesh (Bheramara)-India (Baharampur) Grid Interconnection
14 Comilla-Meghnaghat-Haripur 230 kV Transmission Line and Turn in and out at Rampura of Existing Ghorasal-Haripur 230 kV Transmission Line Project
15 Construction & Extension of Grid Substations including Transmission Line Facilities (Phase-1)
16 Construction of 230 kV Switching Substation at Bibiyana
17 Construction of Bakerganj-Barguna 132kV Transmission Line & Barguna 132/33kV Substation.
18 Construction of Bheramara (Bangladesh)-Baharampur(India) 2nd 400kV Transmission Line (Bangladesh Portion)
19 Construction of Haripur 360 MW Combined Cycle Power Plant & Associated Substation (PGCB part in EGCB's project)
20 Construction of Patuakhali (Payra) - Gopalganj 400 kV Transmission Line & Gopalganj 400 kV Grid Substation
21 Construction of Rahanpur to Monakasha Border 400kV Transmission Line in Chapainawabganj District to Import Power from India (Jharkhand) to Bangladesh
22 Development of Transmission Infrastructure at Mirsharai Economic Zone for Reliable Power Supply.
23 Dhaka - Chattogram Main Power Grid Strengthening Project
24 Enhancement and Strengthening of Power Network in Eastern Region
25 Enhancement of Capacity of Grid Substations and Transmission Lines for Rural Electrification.
26 Feasibility Study for the Transmission System Improvement, Western Zone
27 Feasibility Study to Connect Nuclear Power Plant with National Grid
28 Goalpara - Bagerhat 132 kV Double Circuit Transmission Line Project
29 Grid Interconnection between Bangladesh (Bheramara) and India (Baharampur)
30 Grid Interconnection between Tripura (India) and Comilla (South substation) (Bangladesh)
31 Hasnabad-Aminbazar (Savar)-Tongi & Haripur-Meghnaghat 230 KV Transmission Line Project
32 Infrastructure Development for Power Evacuation Facilities of Rooppur Nuclear Power Plant
33 Institutional Strengthening of PGCB
34 Integrated Capacity Development Project in the Power Transmission System of Bangladesh
35 Ishwardi-Baghabari-Sirajganj-Bogra 230 kV Transmission Line Project
36 Joydevpur-Kabirpur-Tangail 132 kV Transmission Line Project
37 Khulna-Ishurdi and Bogra-Barapukuria 230 kV Transmission Line Project
38 Matarbari Ultra Super Critical Coal-Fired Power Project (II) (PGCB Part: “Matarbari-Madunaghat 400 kV Transmission Line”)
39 Meghnaghat-Aminbazar 400 kV Transmission Line (Phase-1)
40 Mongla-Khulna(S) 230 kV Transmission Line Project
41 Naogaon - Niamatpur 132 kV Transmission Line Project
42 National Power Transmission Network Development Project
43 Natore-Rajshahi 132 kV Single Circuit Transmission Line Project
44 NLDC (National Load Dispatch Centre) Project
45 Patuakhali -Payra 230 kV Transmission Line Project
46 Replacement of Ashuganj Old 132 kV AIS Substation by New 132 kV GIS Substation Project
47 Second East-West Electrical Interconnector Project (Ashuganj-Jamuna Multipurpose Bridge-Sirajganj 230 kV Transmission Line)
48 Shunt Compensation at Grid Substation by Capacitor Banks (Phase-I) Project
49 Siddhirganj - Maniknagar 230 kV Transmission Line Project
50 Southwest Transmission Grid Expansion Project