| Objective(s) | • To address some fundamental measures that must be put in place so that the power system can be operated in a secure and economic manner in line with the longer term goals to deliver much greater quantum of power. |
| Scope of Work |
a) Reconductoring of Barisal(N)-Barisal 132 kV Double Circuit line: 10km b) Reconductoring of Saidpur-Purbasadipur 132 kV Double Circuit line: 30 km c) Introduction of DLR (Dynamic Line Rating) for 400 km of most important transmission lines of PGCB. d) Integration of generators to the NLDC’s SCADA/EMS system, upgradation/modernization of the NLDC’s SCADA/EMS system to meet future needs. |
| Project Cost | Total: 30211.70 Lakh BDT, GOB: 5163.43 Lakh BDT, PA: 21868.98 Lakh BDT, PGCB: 3179.29 Lakh BDT |
| Development Partner | World Bank |
| Duration | July, 2017 to June, 2025 |