| Objective(s) |
i. To evacuate power to be generated from Bibiyana power plant to national grid. ii. To increase power supply stability, reliability, and transmission capability in Sylhet area. |
| Scope of Work |
a) Construction of 230 kV Switching Substation at Bibiyana b) Construction of 230kV LILO (0.97km) line from Fenchuganj-Comilla (N) at Bibiyana Substation |
| Project Cost | Total: 117.32 crore BDT(PGCB), LC: 75.75 crore BDT, FC: 5.35 m USD |
| Development Partner | N/A |
| Duration | June 2013 to June 2015 |