| Objective(s) | To evacuate power from existing 50 MW and upcoming 100 MW power plants at Amnura and to meet the growing demand of Amnura area of Chapainawabganj district. |
| Scope of Work |
1. 132 kV single circuit pole line (Most of the Poles will be provided from PGCB store), from Rajshahi-Chapainawabganj 132 kV line (T connection at 1 km away from Chapainawabganj substation) to Amunra substation on single circuit pole line : 15 km (Single Grossbeak) 2. 132/33 kV AIS substation, Double Bus Scheme with 132/33 kV, 1 x 35/50 MVA 3-Phase transformer; 132 kV Line Bay: 4 nos. 132 kV Transformer Bay: 1 no. 132 kV Coupler Bay: 1 no. 33 kV Transformer Bay: 1 no. |
| Project Cost | Total: BDT 9166.55 Lakh BDT; Local Currency (LC): BDT 4163.91 Lakh BDT; Foreign Currency (FC): BDT 5002.64 Lakh BDT |
| Development Partner | - |
| Duration | January, 2014 to December, 2019 |