Bid No Name of the Work Opening Date Submission deadline Details
PGCB/ADB/3522/400kV/TL/AGTL Design, Supply, Installation, Testing & Commissioning of the Aminbazar - Gopalganj 400kV Double Circuit Transmission Line on turnkey basis. 12-03-2018 12-03-2018
11:00 BST
PGCB/Sec(SSD & QC)/2017/7143 Design, Supply, Erection, Testing and Commissioning of 132 kV Gas Insulated Switchgear (GIS) Bay Extension at Existing Maniknagar Grid Substation (GSS) and 132 kV Air Insulated Switchgear (AIS) Bay Extension at Existing Tongi Grid Substation (GSS) on Turnkey Basis 01-02-2018 01-02-2018
11:00 BST
02/PGCB/Sec(SSD&QC)/2017/6159 Procurement of Plant Design, Supply and Installation of Package SS-2 Design, Supply, Erection, Testing & Commissioning of 400/230kV Madunaghat GIS Substation on Turnkey Basis 30-01-2018 30-01-2018
11.00 am
01/PGCB/Sec(SSD & QC)/2017/6501 Design, Supply, Installation, Testing & Commissioning of Gopalganj 400/132 kV Substation on turnkey basis 23-01-2018 23-01-2018
11.00 am
27.21.0000.101.07.001.17.4874 Design, Supply, Installation, Testing and Commissioning of 230/33kV GIS Substation at Mirsharai EZ and extension of 230kV GIS bays at existing 230/33kV BSRM Substation on Turnkey Basis 10-01-2018 10-01-2018
11.00 AM (BST)
27.21.0000.411.07.201.17.5250 Design, Supply, Installation, Testing and Commissioning of the Padma River Crossing Portion of Aminbazar-Maowa-Mongla 400 KV Double Circuit Transmission Line on turnkey basis 18-12-2017 18-12-2017
11:00 AM (BST)
27.21.0000.101.07.001.17.5554 SUPPLY OF TRANSMISSION LINE EMERGENCY RESTORATION SYSTEM (ERS) 07-12-2017 07-12-2017
11:00 AM (BST)
27.21.0000.101.07.207.17.5653 REQUEST FOR EXPRESSIONS OF INTEREST (EoI) Consultancy Services for System Studies and Technical Assistance to improve System Reliability and Efficiency Under Bangladesh Power System Reliability and Efficiency Improvement Project 13-11-2017 13-11-2017
05.00 PM (BST)
27.21.0000.101.14.001.17.4900 International Engineering Consulting Services For Replacement of Overhead Transmission Line by Underground Cable including river crossing portion 24-09-2017 24-09-2017
5:00 pm
01/PGCB/Sec(TLD&QC)/3784 Replacement of existing 132 kV double Circuit line over proposed 400kV switchyard by underground cable and supply of Stub Materials on Turnkey Basis. (Contract No. PGCB/132KV/UG/AMINBAZAR) 13-08-2017 13-08-2017
11:00 AM(BST)
01/PGCB/Sec(SSD & QC)/2017/3645 Design, Supply, Transportation, Installation, Erection, Testing and Commissioning of 230/√3/138/√3/34.5 kV, 45/60/75 MVA single phase auto transformer at Hasnabad & Haripur 230/132 kV substation on turnkey basis. 10-08-2017 10-08-2017
11.30 AM
01/PGCB/Sec(TLD&QC)/3518 Supply, Delivery, Installation, Testing & Commissioning of Bheramara (Bangladesh)-Baharampur (india) 2nd 400kV Double Circuit Overhead Transmission Line (Bangladesh portion) on Turnkey Basis. Contract no. PGCB/400kV/BHRM-BHER/TL 09-08-2017 09-08-2017
11:00 AM(BST)
01/PGCB/Sec(SSD & QC)/2017/2562 Design, Supply, Installation, Testing & Commissioning of Aminbazar 400/230 kV Substation on turnkey basis 07-08-2017 07-08-2017
11:30 AM (BST)
PGCB/Sec(SSD & QC)/2017/3691 Engineering Consulting Services For Supervision of the implementation of 400/132kV Sub-Station at Gopalganj Under “Construction of Patuakhali (Payra) – Gopalganj 400 kV Transmission Line and Gopalganj 400 kV Grid Substation” Project. 30-07-2017 30-07-2017
16.30 BST
01/PGCB/Sec(TLD&QC)/3579 SUPPLY OF TRANSMISSION LINE EMERGENCY RESTORATION SYSTEM (ERS) 26-07-2017 26-07-2017
11.00 AM
01/PGCB/Sec(SSD&QC)/3423 Design, Supply, Erection, Testing and Commissioning of New 132/11kV Air Insulated Substation at Payra and extension of 132 kV bays at existing Patuakhali 132/33kV Substation on Turnkey Basis 19-07-2017 19-07-2017
11:00 AM(BST)
01/PGCB/Sec(TLD&QC)/3183 Design, supply, installation, Testing & Commissioning of 230kV Single Circuit Cu. XLPE cable from Ghorasal 4th unit to 230kV Switchyard. (Contract No. PGCB/230kV/UG/GHOR) 11-07-2017 11-07-2017
11:00 AM(BST)
01/PGCB/Sec(SSD & QC)/2017/ 1831 Design, supply, installation, testing and commissioning of 132/33kV Substation at Barguna on turnkey basis 01-06-2017 01-06-2017
11:30 AM (BST)
01/PGCB/Sec(TLD&QC)/981 Supply, Installation, Testing & Commissioning of Bakerganj – Barguna 132kV Transmission Line on Turnkey Basis (Contract No. PGCB /132KV/ BKG-BGN/ TL) 30-04-2017 30-04-2017
11:00 AM (BST)
01/PGCB/Sec(TLD&QC)/7092 Supply, Installation, Testing & Commissioning of Patuakhali - Payra 230kV Transmission Line on Turnkey Basis 13-04-2017 13-04-2017
11:00 AM (BST)