| Objective(s) |
i. To meet the growing demand of the respective areas of the proposed new 132/33 kV substations at Kulaura & Sherpur. ii. To relieve the loading of existing 132/33 kV substations supplying power to the concerned area. |
| Scope of Work |
(1) Construction of 20 km 132 kV double circuit interconnecting line (Jamalpur-Sherpur) (2) Construction of 25 km 132 kV double circuit interconnecting line (Fenchuganj-Kulaura). (3) 132/33 kV, 2x25/41 MVA Substation at Kulaura (4) 132/33 kV, 2x35/50 MVA Substation at Sherpur. (5) Extension of 2 nos. 132 kV bays and shifting & renovation of existing bus coupler bay at Jamalpur substation. |
| Project Cost | Total: BDT 217.4796 crore(PGCB), Local Currency (LC): BDT 90.24 crore; Foreign Currency (FC): BDT 127.2396 crore |
| Development Partner | N/A |
| Duration | January, 2012 to June, 2016 |