| Objective(s) | To evacuate the power to be generated at the proposed power plant at Shahbajpur, Bhola. To minimize the overloading of the existing Bhola-Patuakhali 33 kV line To strengthen the power evacuation arrangement & increasing power supply stability, reliability & transmission capability in Barisal area. |
| Scope of Work | 1. Construction of overland 230 kV Transmission Line from Kutuba (Borhanuddin) to Gajalia, Babuganj (Barisal)-55.55 km. 2. Tetulia and Kalbadar River Crossing-5.45 km. 3. 230/132 kV, 3x225 MVA substation at Gajalia, Babuganj. |
| Project Cost | Total: BDT 453.4260 crore(PGCB), Local Currency (LC): BDT 286.4081 crore; Foreign Currency (FC): BDT 167.0179 crore |
| Development Partner | N/A |
| Duration | March, 2011 to June, 2017 |