| Objective(s) | The main objective of the project is to create facilities to evacuate power from the upcoming Rampal, Payra Coal Power Plant and Rooppur Nuclear Power Plant (partial). |
| Scope of Work |
1) Construction of Aminbazar-Gopalgonj 400 kV Double Circuit line: 75.00 km. 2) Construction of Gopalgonj-Mongla 400 kV Double Circuit line: 96.93 km. 3) Construction of river crossing 400kV Double Circuit line beside Padma Bridge: 7.50 km. 4) Construction of 400 kV AIS substation at Aminbazar with 3×520 MVA 400/230 kV, 3-Phase transformer. |
| Project Cost | Total: 235325.20 Lakh BDT GoB: 81113.89 Lakh BDT PA:121856.69 Lakh BDT PGCB:32354.62 Lakh BDT |
| Development Partner | ADB |
| Duration | July, 2016 to June, 2023 |